11kV Transformer - A Case Study

From concept to completion Inspec Systems Ltd are proud to announce the successful commissioning of a new 1.6MVA, MV to LV transformer for a major chemicals site based in Hull.

As part of a debottlenecking project additional equipment and power requirement was identified requiring the installation of a new transformer with the significant modification of existing distribution equipment.

Project Scope

This new transformer provides a standalone power supply to an LV Motor Control Centre (MCC). This feeder supports the client’s investment in their biofuels plant, providing a future proofed distribution system considering capacity for planned and future investment.

11kV System Design

Through the production of a complete earthing design, covering touch and step potential, we identified shortcomings in the Clients existing earthing installation leading to further improvements across site.

Due to the significant increase in load the project required the full electrical distribution to be modelled in ETAP considering load flow, harmonics, and protection settings.

Primary Deliverables

The following outlines the key deliverables for the project:

  • Feasibility study with cost assessment,
  • Front end engineering design (FEED) study
  • Detailed design and engineering including:
  • MV and LV cable calculations,
  • LV/LV protection settings study and inter-trip requirements,
  • Transformer earthing study and design—touch and step potential
  • Installation and testing including:
  • Full cable point to point and inter-trip testing between LV and HV protection cubicles
  • Secondary injection testing of Vacuum Circuit Breaker (VCB) and Air Circuit Breaker (ACB) protective devices
  • Primary injection testing of Restricted and Standby Earth Fault (REF and SBEF) Current Transformers (CTs)
  • Torque testing of all terminations: HV, transformer and LV
  • LV cable testing to BS7671 and HV cable testing

Conclusion

From feasibility to completion the project overall was considered a success—with delivery on time, on cost, and with zero QHSE concerns.

Feedback from the Client throughout the project included:

  • “Inspec’s actions reduced the impact of delays and helped keep the project on time and within cost.”
  • “We like Inspec because they take ownership, and have the people to do the complete job”.

What Next?

This project further demonstrates our broad capabilities and turnkey approach. Call us today to discuss how we can help you.

 